
Building an IT Disaster Recovery Plan When the Primary Risk Is Power, Not Cyberattack
Most DR templates assume the disaster is a hacker. In Nigeria it is usually the grid. A power-first disaster recovery framework with realistic RTO/RPO targets and tiered recovery.





